Projects: Case Studies
- Case Study 2:
- Manhattan Beer Distributor
- Goal:
- Lighting System Upgrade
The lighting system in this newly acquired building consisted of over (200) 400 watt metal halide fixtures. Manhattan Beer, realizing these fixtures were very inefficient, was in need of an energy efficient replacement solution.